One of the very first in Jordan . Total Capasity :35 KW ,Rooftop,Low voltage connected on Net metering basis. Commercial Operations Date : April 2014 Project Value : 132,240 JD
Total capacity: 1.75 MW, Rooftops on Net metering basis. Under Construction Project Value: 575,944 JOD
Our Scope to Review, Amend and Design new flight procedures where needed and to keep flight procedures valid and up to date, within Jordanian airspace according to ICAO standards Project Value: 2,086,719 JOD
Total capacity: 1.4058 MW, rooftops, connected on Net metering basis. Commercial Operation Date: Oct, 2022 Project Value: 1,046,600 JOD
Our scope was to Supply, install, operate, test, commission and training the equipment’s Project Value: 1,953,729 JOD
Total capacity: 0.804 MW, Carports, Canopies & Rooftops in Net metering basis. Commercial Operation Date: Oct 2017. Project Value: 873,000 JOD
Total capacity: 2.11 MW in 6 areas, Carports and rooftops, Low voltage connected and on Net metering basis. Commercial Operation Date: Oct 2017. Project Value: 2,318,000 JOD
Total capacity: 1.1 MW, Ground mounted solar farm, Connected on EDCO overhead lines and Wheeling basis. Commercial Operation Date: Sept 2017. Project Value: 1,175,000 JOD
Total capacity: 3MW, Ground mounted solar farm, BOT (10 yrs) and Net metering basis Commercial Operation Date: June 2017 Project Value: 6,474,960 JOD
The project is considered the first of its kind in the kingdom and among all universities in the Middle East and North Africa. It received a special royal interest and was launched in June 2016 with a huge opening ceremony under the patronage of his Royal Highness Prince El Hassan Bin Talal. Total capacity is […]